Office Partition Cost and Project Quotation Request
Share the project information you already have. A floor plan or layout drawing, wall height, project location, and estimatedpartition area are usually enough to begin a preliminary review.
Door, material, finish, performance, and schedule details can be added when available.
Project Basics Needed Before Quotation
To prepare an initial quotation for your office partition project, please share the key project and configuration details. These details may include the project location, project type, your role in the project, estimated partition area, current project stage, target timeline, and whether a floor plan, layout drawing, BOQ, or preliminary project description is available. If already confirmed, you may also share the system route, wall height, material direction, door type, hardware requirements, or performance requirements.
If your project information is not complete yet, you can still send your available drawings, BOQ, or project description first. We will review the information provided and help identify what may still be needed before moving into a more accurate quotation.
What to Share for a Quotation
- Project location
- Project type and current stage
- Estimated partition area
- Layout drawing, floor plan, or BOQ, if available
- Wall height
- Preferred SG platform, if known
- Door quantity, door type, and hardware requirements
- Preferred wall material and finish, if known
- Acoustic, privacy, or fire-related requirements
- Ceiling and floor conditions, where relevant
- Target timeline
Why Area Alone Is Not Enough for Office Partition Cost
Office partition costs cannot be quoted accurately by area alone. Even when two projects have the same area, the quoted cost can still vary depending on wall height, layout complexity, door quantity, door type, opening locations, and site interface conditions.
Area only shows the project scale. It does not show material waste, door opening configuration, corner conditions, zoning complexity, or whether special sizes or custom requirements are involved. To prepare a more accurate office partition quotation, we usually need to review the layout drawing together with the door schedule or door quantity information, instead of making a rough estimate based only on square meters.
| Cost Driver | What Needs to Be Confirmed |
|---|---|
| Wall height | Different heights may affect material utilization and system configuration. |
| Layout complexity | Straight runs, corners, and multi-room layouts may affect wall measurement and material waste. |
| Door quantity | Door quantity and related accessories usually need to be confirmed separately. |
| Door type | Different door types use different materials and configurations, so costs may vary. |
| Hardware | Locks, hinges, handles, door closers, and other hardware requirements may affect the door system quotation. |
Choose an SG-40, SG-86, or SG-100 Starting Route
Before requesting a quotation, compare the three platforms to see whether SG-40, SG-86, or SG-100 is closest to your space, privacy, performance, and budget requirements.
SG-40 is typically selected where visual openness and a slimmer glass appearance are priorities. SG-86 suits standard offices, meeting rooms, and mixed glass-and-solid configurations. SG-100 may be considered where higher privacy, a more substantial wall build-up, or project-specific acoustic, fire-related, full-height, or corridor-wall requirements need deeper technical review. The project sector alone does not determine the platform.
The final platform and configuration must still be confirmed against the drawings, wall height, layout, doors, materials, performance requirements, and site conditions.
Review Wall Type, Finish and Sample Requirements Before Quotation
When preparing an office partition quotation, the system model is only one part of the review. The profile finish also needs to be confirmed, such as anodizing or powder coating. It is also important to clarify the glass thickness, whether a solid wall surface will be used, or whether the project requires a mixed glass + solid configuration. If applicable, please also indicate whether melamine panels, steel panels, wood finish, custom colors, or other finish requirements are being considered.
Different profile finishes, surface materials, and color requirements can affect the final cost. Material selection should also be considered alongside the required acoustic privacy level and any fire-resistance requirement, including the required duration where specified. Sample requirements are normally discussed after the preliminary quotation and configuration have been reviewed.
- Glass — Glass thickness and glass type, such as standard glass or ultra-clear glass.
- Solid — Whether a solid wall surface is required and whether it matches the intended design.
- Mixed Glass + Solid — Whether the project requires a combination of glass and solid wall surfaces.
- Melamine Panel — Melamine panels are commonly used for cost-sensitive solid wall surface applications.
- Steel Panel — Whether steel panels are being considered, and the required steel panel thickness.
- Wood Finish — Whether a wood-look finish or a solid-color finish is required.
- Custom Color — Whether there is a specified color code, physical color sample, or special color direction.
Explore related wall-type options: glass partition systems or solid demountable partition walls.
Clarify Performance Requirements Before Requesting Technical Documents
If the project has acoustic, privacy, fire-related, full-height, or local project requirements, include them with your enquiry. Available technical documents must be matched to the proposed platform, configuration, drawings, site conditions, and intended use; these requirements are not standard commitments for every configuration.
Technical Support After the Preliminary Quotation
Once the preliminary quotation is within your expected range, you can request additional support for tendering, client presentations, material review, or design development.
Based on the project stage and actual configuration, we can review whether renderings, detail drawings, CAD coordination,BIM / 3D models, specification sheets, installation reference documents, or relevant reports and certificates can be provided. Available support depends on the selected platform, configuration, drawings, performance targets, intended use, and the documents currently available for that configuration.
Lead Time, Samples, Packing, Payment, and Warranty Items to Confirm During RFQ
Before order confirmation, confirm the lead time, sample needs, color approval, packing method, payment terms, and warranty scope. The final terms should be based on the confirmed order and project contract.
Questions Before Requesting an Office Partition Quote
Can I request an office partition quote without complete drawings?
Yes. You can first send your available project description, preliminary layout drawing, BOQ, wall height, door quantity, and the model you plan to use. More complete project details help us check the configuration and prepare a more accurate quotation.
Can office partition cost be quoted based only on sqm?
Sqm can be used as an initial reference, but it cannot be used as the final basis for quotation. Office partition cost also needs to be calculated together with the layout, wall height, door quantity, door type, hardware, material details, and configuration requirements.
Can I request a quote before deciding between SG-40, SG-86, and SG-100?
Yes. We can discuss an initial cost range before the platform is confirmed. The selected platform and configuration must be confirmed before the formal project quotation is finalized.
Can I submit a request if the glass, solid panel, finish, or color has not been finalized?
Yes. You can submit the preliminary requirements first, but the main material direction needs to be confirmed before an accurate quotation can be prepared. The cost of a demountable wall can be affected by glass, solid panels, finish, surface treatment, color, and material combinations. If these details have not been confirmed yet, the quotation can usually only be used as an initial reference.
Can I request CAD, BIM, reports, certificates, or case references together with the quotation request?
Yes. You can include these requests with your enquiry. Include the documents or case references you need and explain how they will be used. We will match the available files to the project stage, proposed configuration, and intended use.
What usually happens after I send the project information?
We will check the information provided, ask for any essential missing details, and then proceed with the quotation or relevant technical support.
Send Your Drawings for a Quotation
If you are ready to request an office partition quotation, you can first send your available layout drawing, door schedule, or other project documents. The information does not need to be complete at the first submission. We will review the materials you provide for quotation purposes and help identify what additional details may be needed for the next step.
To help us move the quotation review forward more efficiently, we recommend sharing the key quotation details when you submit your request, such as wall height, door quantity, product model, finish requirements, hardware category, performance needs, and technical document needs.
Request Technical Document Support
What to Include With Your Request
You may prepare the following information before submission:
- Layout drawing
- Wall height
- Door quantity and door type
- Wall type / product model
- Finish / color requirements
- Performance needs
- Technical document needs
- Project location
